| Customer |
Engineer |
Description |
|
Sonoma County Water Agency |
Owner & ZSI, Inc. |
Modified existing SCADA influent and effluent systems and
integrating into the existing SCADA system a Tertiary WTP project
to be completed Summer 2007. |
|
Sonoma County Valley Sanitation District |
Owner & ZSI, Inc. |
Reprogrammed Effluent System PLC's outdated ladder logic
program with IEC format and reconfigured OIU's text-based software
with user-friendly graphical interface representing the process
and ancillary equipment. |
|
City of Vacaville |
Tetra Engineering |
5 MG Reservoir consisting of inlet / outlet valve automation,
pressure monitoring, security, and integration with existing
repeater site and SCADA software. |
|
Sonoma County Valley Sanitation District |
Owner & ZSI, Inc. |
Reprogrammed Influent System PLC's outdated ladder logic
program with IEC format and reconfigured OIU's text-based software
with user-friendly graphical interface representing the process
and ancillary equipment. |
|
Sonoma County Valley Sanitation District |
Owner & ZSI, Inc. |
Automation of Return and Waste Activated Sludge Systems using
cascade PID control, and Plant Drainback System. Revamped Reservoir
R4 Pump Station Control System. |
|
City of Rohnert Park |
Winzler & Kelly |
Replace 200HP Variable Frequency Drive at Pump Station with
new VFD. |
|
Sonoma County Valley Sanitation District |
HDR Engineering |
Automation of Aeration Basin dissolved oxygen using cascaded
PID loops, five (5) 250HP solid-state starters, modulating valves,
flowmeters, and pressure transmitter integrated with Modicon
PLCs and Panelmate Operator Interface Units. |
|
Sonoma County Valley Sanitation District |
Owner & ZSI, Inc. |
Automation of Aeration Basin Levels and Flow using a cascade
loop and timed-averaging of flow samples to stabilize flow of
plant through the diurnal and nocturnal periods. |
|
City of Stockton |
Parsons Engineering |
Automation of Influent and Effluent Systems at the Regional
Water Treatment Plant using Allen Bradley 540 PLC, remote racks,
and Operator Interfaces connected via fiberoptics, 7 Cutler-Hammer
VFDs (100HP-400HP), cable trays, and substation equipment. |
|
City of Yuba City |
HDR Engineering |
Automation of Sand Filters, Backwash System, Instrumentation,
and other ancillary equipment at existing Water Treatment Plant
using redundant Modicon PLCs. |
|
City of Brentwood |
Carollo Engineers |
Interim Booster Pump Station - SCADA and 900 MHz Telemetry
project for inter-tie booster pump station, reservoir, and treatment
plant. |
|
McClellan, USAFB |
CH2M Hill |
Mc Clellan AFB - Leased-line Telemetry monitoring and control
system for a Ground Water Remedial Construction of various well
pump site controllers, process instrumentation equipment, and
programmable logic controllers (PLCs). |
|
City of West Sacramento |
City of West Sacramento |
Bryte Bend WTP - Instrumentation, monitoring, and control
of a new Clearwell using a bubbler system, and modifications
to existing Clearwell and Main Control Panel. |
|
El Dorado Irrigation District |
ATEEM Engineering |
Telemetry System-Weber Dam Flood Alert. New construction
to fabricate, furnish, and install control panels with central
programmable logic controller (PLC) polling via radio link remote
sites having PLCs used to monitor flows and water levels. |
|
Citizens Utilities of California |
Citizens Utilities of California |
Parkway District - Radio Telemetry control system consisting
of RTUs and Instrumentation for a SCADA system managing wells
for customer consumption and power shedding and management. |
|
California Department of Corrections - Vacaville |
ATEEM Engineering |
Emergency Bed Process Instrumentation and Control System
- SCADA and Leased-line Telemetry project for pump station, inter-tie
station, filter plant, and ancillary equipment. |
|
Citizens Utilities of California |
Norberg/Interface Engineering |
Falcon View Well - Well pump station consisting of switchgear
having 100 HP RVAT and 100 HP VFD, instrumentation, control,
treatment, and Leased-line telemetry. |
|
Citizens Utilities of California |
ATEEM Engineering |
Parksite WTP Methane Stripping Facilities - Installed new
control system to interface with and be controlled by an existing
PLC system. |
|
Richardson Springs Community Services District |
Norberg Engineering |
Wastewater Treatment Plant Improvements. All new construction
to furnish and install new MCC, pedestal, process instrumentation
equipment, autodialer, and operations building electrical. |
|
City of Sacramento |
City of Sacramento |
Riverside Water Treatment Plant Electrical Improvements.
New construction to furnish and install medium voltage 5kV vacuum
switch, 5kV cable, and 1000 kVA transformer. |
|
City of Sacramento |
City of Sacramento |
Pioneer Reservoir "Flood Water Emergency Storage Basins"
Facility and Washdown Automation. Retrofit existing facility
adding a programmable logic controller and graphical operator
interface unit to automate system thus reducing manpower requirements. |
|
Winton Water District |
ZSI, Inc. |
Motor Damage Analysis. Field evaluate equipment and installation
by other contractors and power quality of local utility for possible
causes of multiple pump motor failures. |
|
Louisiana-Pacific Corp. |
ZSI, Inc. |
Window Packaging Equipment. Re-wired controller from manual
operation to automatic operation and provided ACAD As-builts
within 24 hours from the initial request for urgent service. |